Seale No. 1 Ground Storage Tank Painting and Rehabilitation

San Antonio Water System

Grubb Engineering designed electrical and SCADA system upgrades for an existing ground storage tank. GEI’s design includes a 120V electrical distribution system, SCADA system I/O additions, lighting, grounding system, and instrumentation upgrades.