Regional Carrizo Project, Schertz Parkway Pump Station

San Antonio Water System

This project involved the design of electrical, instrumentation, security, SCADA and control systems.

Design included a new pump station located in the City of Schertz and improvements to an existing pump station in the City of San Antonio.  Project included new 5kV and 208/120V electrical distribution systems, SCADA control system, instrumentation system, security system and indoor/outdoor lighting for the Schertz Parkway Pump Station. The station includes a building that houses the electrical equipment and was designed to meet all building codes including emergency and egress lighting. The project also included similar electrical and control upgrades at SAWS Naco Pump Station.