Basin Pump Station Improvements – Phase I

San Antonio Water System

This project involved the complete redesign and replacement of the existing electrical, instrumentation, and control systems at a 55-year-old facility.  Project included the replacement of all of the 5kV high service pump and well pump starters,  4160V high service pump motors, power panels, low voltage transformers, lighting, pressure instruments, level instruments SCADA System PLC and flow instruments